Statement of Work Examples: 3 Filled-In SOWs to Copy

Three finished statement of work examples with real numbers in them: fixed price, time and materials, and a monthly retainer. Plus the SOW format all three share.

Premier Logic10 min read
Three printed documents laid side by side on a wooden desk with a pen and a coffee cup, each with visible section blocks and a signature line, soft daylight, no readable text or logos. 16:9 photo.

A statement of work example is a finished SOW with real numbers in it: what gets built, by when, for how much, and how both sides agree it is done. Below are three filled-in examples you can copy, one for each common way of paying for software work: fixed price, time and materials, and a monthly retainer. The companies are invented. The structure is the one that holds up when a project gets difficult.

What does a statement of work example look like?

A good statement of work example is short, specific and testable. Most fit on two to four pages, and every line can be checked by someone who was not in the sales call.

All three examples below use the same eight parts. The statement of work template guide from Worksuite, updated in October 2026, lists them as parties, scope, deliverables, timeline, pricing, acceptance criteria, change control and out-of-scope exclusions. It singles out the exclusions list as the section that prevents the most disputes.

This page shows finished documents. If you want each section explained, including intellectual property, warranty and termination, read what a software development statement of work must include.

One note before the examples. A SOW normally sits under a contract that carries the legal terms. The SOW carries the project: the what, the when and the how much.

SOW example 1: what does a fixed-price software development SOW look like?

A fixed-price SOW names a finished product and one total, and ties every payment to an accepted milestone. Use it when the scope is known before work starts.

Sample SOW: tenant maintenance portal (invented example)

  • Parties. Ridgeline Property Group (Client) and the development studio (Vendor). Issued under the Master Services Agreement dated March 2, 2026.
  • Background and goal. Ridgeline manages 1,400 apartments and takes repair requests by phone and email. The goal is a web portal where tenants submit requests and staff assign them, so that no request lives in a spreadsheet after launch.
  • In scope. Tenant sign-in by email link. Request form with photo upload. Staff dashboard with status, assignee and due date. Email notifications on status change. Import of 1,400 units and current tenants from the Client CSV export. Admin screen to add buildings and staff.
  • Out of scope. Native mobile apps. Online rent payments. Integration with the accounting system. Translations. Cleanup of the CSV data beyond format fixes.
  • Deliverables. (1) Clickable design prototype of 9 screens. (2) Working portal on a staging address. (3) Production launch on the Client domain. (4) Source code in the Client GitHub account and a 10-page admin guide.
  • Timeline. 14 weeks from kickoff. Design in weeks 1 to 3, build in weeks 4 to 11, testing in weeks 12 and 13, launch in week 14.
  • Price and payments. $68,000 fixed. 20% at signing, 30% at prototype approval, 30% at staging acceptance, 20% at launch.
  • Acceptance. Client tests each deliverable against the checklist in Appendix A within 5 business days. No reply within 5 business days counts as acceptance. Two rounds of revisions per deliverable are included.
  • Assumptions. Client names one decision maker. Client supplies the CSV export and logo files in week 1. Hosting is billed to the Client directly.
  • Change control. Any change to scope, price or dates needs a written change order signed by both sides before work on it starts.
  • Warranty. Vendor fixes defects against the Appendix A checklist for 60 days after launch at no charge.

What to notice: the numbers. Nine screens, 1,400 units, 5 business days, two rounds. A fixed price is only fixed when the scope is countable.

Notice the silence clause too. Worksuite recommends a deemed-acceptance line and a fixed number of revision rounds, so a review cannot stall the project or run forever.

Not sure fixed price is right for you? We compare the two models in fixed price vs time and materials.

SOW example 2: what does a time and materials SOW look like?

A time and materials SOW names a goal, a rate and a cap instead of one total. Use it when part of the work cannot be known in advance, such as connecting to an older system.

Sample SOW: field app to QuickBooks integration (invented example)

  • Parties. Calder Mechanical (Client) and the development studio (Vendor).
  • Goal. Invoices created in the field service app appear in QuickBooks Online within 15 minutes, with no retyping.
  • In scope. Discovery of both APIs, up to 20 hours. One-way sync of customers, invoices and payments from the field app to QuickBooks. Error log and email alert on a failed sync. Staging test with 200 historical invoices.
  • Out of scope. Two-way sync. Payroll. Inventory. Records dated before January 1, 2026. Changes to the field app itself.
  • Deliverables. (1) Discovery memo with a field-by-field mapping. (2) Working sync in staging. (3) Production cutover. (4) A runbook that explains how to restart the sync and read the error log.
  • Rates and cap. $165 per hour, one blended rate. Not-to-exceed cap of $29,700, which is 180 hours. Vendor alerts the Client in writing at 75% of the cap. Work stops at the cap unless a change order raises it.
  • Reporting and invoicing. Weekly timesheet with hours by task, approved by the Client project lead. Invoices monthly, payable in 15 days.
  • Timeline. Target of 8 weeks. Dates are estimates, because parts of the field app API are undocumented.
  • Acceptance. All 200 test invoices sync with zero mismatched totals. A forced failure raises an alert within 15 minutes. Client review within 5 business days.
  • Assumptions. Client provides admin access to both systems in week 1. The field app vendor answers API questions within 3 business days.
  • Change control. Same rule as example 1: written and signed before the work starts.

What to notice: the cap and the early warning. Worksuite advises that a time and materials SOW still needs a hard cap, timesheet approval and defined deliverables. Hourly billing with no ceiling is a blank check.

Look at the acceptance line as well. The SOW template guide from Plexus, published in June 2026, separates deliverables from success measures. The sync is the deliverable. "Within 15 minutes, zero mismatched totals" is the success measure, and it is what you use to accept or reject the work.

SOW example 3: what does a retainer or support SOW look like?

A retainer SOW describes a recurring amount of work instead of a project with an end date. Use it for support, maintenance and small improvements after launch.

Sample SOW: monthly support retainer (invented example)

  • Parties. Marlow Dental Partners (Client) and the development studio (Vendor).
  • Term. 12 months from January 1, 2027. Either side may end it with 30 days of written notice.
  • Monthly scope. Up to 20 hours per month for bug fixes, small improvements, security and dependency updates, uptime monitoring, and one backup restore test for the patient booking system.
  • Out of scope. New features estimated above 16 hours each, which are quoted separately. Third-party license fees. On-site work.
  • Response times. System down: response within 1 business hour, fix target 8 hours. Major function broken: response within 4 business hours, fix target 2 business days. Everything else: response next business day, scheduled into the month.
  • Fee. $3,200 per month, invoiced on the 1st. Extra hours at $170 each, only with written approval.
  • Unused hours. Up to 5 unused hours roll over for one month, then expire.
  • Reporting. A report by the 5th of each month: hours used by task, incidents, updates applied and recommendations.
  • Acceptance. A request closes when the Client confirms the fix, or after 3 business days without a reply.
  • Exit. On termination, Vendor hands over credentials, documentation and the open task list within 10 business days.

What to notice: the unused hours line. Worksuite lists it as the one thing a retainer SOW must settle, and it is the line most often missing. The response times matter just as much, because "fast support" means nothing until it has hours attached.

For the full support contract around a document like this, see what a software maintenance agreement should include.

Building a website and not an app? Use the statement of work for website development format.

What SOW format do these examples share?

All three SOW format examples answer the same four questions. Only the answers change with the payment model.

Question Fixed price Time and materials Retainer
What does it cost? One total, paid by milestone Hourly rate, cap, timesheets Monthly fee, overage rate
When? Fixed dates Estimates with a target Term and notice period
What does done mean? Acceptance checklist A measurable test Request closed, monthly report
Where does it go wrong? Exclusions nobody listed No cap Unused hours, vague response times

Longer formats exist. Plexus lists 11 sections, adding purpose, location of work, standards and testing, and success measures. Its guide warns that skipping standards and testing is especially risky on technology projects. It also warns about the opposite problem: a SOW so long that the important terms get buried and nobody reads them.

So keep the format tight. If a section does not change what someone will do or pay, cut it.

How do you adapt a sample SOW to your own project?

Start from the example that matches how you will pay, then replace every noun and number with your own. Five steps cover it.

  1. Pick the model. Known scope points to fixed price. Unknowns point to time and materials with a cap. Ongoing work points to a retainer.
  2. Count things. Screens, user roles, integrations, records to import, rounds of revisions. Anything you can count, count.
  3. Write the exclusions. Ask one question: what might the other side reasonably assume is included? Each answer goes on the list.
  4. Turn deliverables into tests. "Working portal" becomes a checklist. "Fast" becomes a number of seconds.
  5. Read it with the contract. Check that payment terms, ownership and termination in the SOW match the agreement above it, and have a lawyer review both before signing.

If you have not chosen a vendor yet, a SOW is one step too early. Start with the brief. Our software development RFP examples show what that document looks like finished.

What mistakes show up in bad SOW examples?

Bad SOW examples fail in predictable ways. The Plexus guide names the common ones, and they match what we see when we are asked to rescue a project.

  • Vague scope. No boundaries and no exclusions list, which is how scope creep and cost fights start.
  • Milestones nobody can verify. "Good progress by month two" is not a checkpoint.
  • Loose deliverables. If two people can disagree about whether it is finished, it is not defined.
  • No testing standard. Nothing says which devices, browsers or data the work must pass on.
  • Fuzzy payment terms. Missing amounts or due dates turn into late invoices and stopped work.
  • A copied template. Sections from another industry stay in, and the parts that matter for software are missing.

The fix is the same for all six. Replace adjectives with numbers and dates.

Quick answers

What is a statement of work example?

A statement of work example is a completed SOW that shows the parties, scope, deliverables, timeline, price, acceptance criteria, change control and exclusions for one project. It is used as a model for writing your own. A useful example has real numbers in it, such as screen counts, dates and payment percentages.

How long should a statement of work be?

Most software and website SOWs run two to four pages plus an appendix for the acceptance checklist. Shorter than that usually means exclusions and acceptance are missing. Much longer usually means legal terms that belong in the contract have been copied in.

What is the difference between a statement of work and a scope of work?

The scope of work is one section inside the statement of work. The scope lists what is included and excluded. The statement of work is the whole document, which also covers deliverables, timeline, price, acceptance and change control.

Is a statement of work legally binding?

A signed statement of work is generally binding, either on its own or because the contract above it says each SOW forms part of the agreement. The details depend on your contract and your state, so have a lawyer review it before you sign.

Can I use a free SOW template I found online?

Yes, as a starting structure. Replace every placeholder with countable scope, write your own exclusions, and add acceptance tests for your project. A template that is signed with its generic wording protects nobody.

Next step

If you have a project in mind and want a second pair of eyes on the SOW before you sign, book a free call. Send us the draft and you will get a short written note back: what is missing, what is vague, and which lines we would change. No commitment needed.

Keep reading
Free call

Let's talk about your business.

A free 30-minute call about your goals. No pitch, no quote. We work for mutual success: tell us as much as you can about where the business should go, and you'll leave with a written recommendation whether or not we end up working together.